What may a consignee do before the goods arrive? Section 434 permits necessary protective measures and instructions, but limits delivery before arrival.

BRANDAUER Rechtsanwälte
Contact person

Mag. Bernhard Brandauer, Austrian attorney-at-law

BRANDAUER Rechtsanwälte

Mag. Bernhard Brandauer assists with the legal assessment of transport contracts, cargo damage and freight claims.

29 September 2026 · Mag. Bernhard Brandauer, Austrian attorney-at-law

If the goods are still in transit and face a concrete risk before arrival, the consignee may take necessary measures to secure them and issue necessary instructions to the carrier under section 434 of the Austrian Commercial Code. The provision does not give the consignee a general power to change the entire carriage order.

The relevant points are the timing, the place of delivery, the specific risk and the purpose of the requested measure. The consignee should describe the instruction so that the carrier can assign it to a particular consignment and a verifiable need for protection.

This article explains the consignee’s rights before arrival, the limit concerning delivery before arrival and the documents that make an instruction traceable. The consignor’s rights under the CMR and issues concerning damage discovered at delivery are addressed only for distinction.

Initial orientation

What does the consignee want to arrange before arrival?

Identify the main issue in your situation. This orientation does not replace a review of the carriage order and the actual communication.

01 Question 1

Which measure is at the centre of the case?

Section 434 distinguishes protective measures, necessary instructions and delivery before arrival.

Result

Your orientation

01

The specific risk and the necessary protective measure must be assessed together.

Describe the consignment, the risk, the requested protective step and the timing. Record why this particular measure is required to secure the goods in the circumstances.

02

An instruction should show its content, recipient, timing and protective purpose.

Send the instruction to the carrier or the known responsible contact and preserve proof of receipt. Avoid an open request such as “please deliver differently” when no concrete protective measure follows from it.

03

Delivery before arrival requires authorisation from the consignor to the carrier.

Separate the request for earlier delivery from a protective instruction. Check whether the consignor authorised the carrier to deliver early. The consignee’s own request does not replace that authorisation.

04

A chronological carriage file makes the risk, instruction and response verifiable.

Arrange the order, consignment data, messages, timestamps, replies and actual measures. Mark what the consignee requested, what the carrier understood and what was actually implemented.

When section 434 applies to the consignee

Section 434 applies when the consignee acts before the goods arrive at the place of delivery. It therefore addresses a particular phase of an ongoing carriage. The goods are still in transit, but the consignee already has an interest in securing them.

The right operates in relation to the carrier. The consignee may therefore arrange measures and issue necessary instructions directed at securing the particular consignment. The first review should record the consignment number, carriage order, planned delivery place and expected arrival time.

The provision belongs to the Austrian Commercial Code and must be distinguished from the law applicable to an international carriage. An international road carriage may be governed by the CMR. The overview of the CMR transport contract helps with that distinction.

Which protective measures the consignee may arrange

The wording of section 434 allows the consignee to take measures required to secure the goods. The practical question is whether the measure protects the goods and appears necessary in the actual circumstances. A general concern or a general wish for different transport arrangements is not enough without facts showing the need for protection.

The consignee should connect the risk and the requested response. For example, a consignment may require a specifically described protective step because of an access problem or another concrete risk before arrival. Whether the step is actually required depends on the facts of the case.

The measure should not be confused with a general instruction to change all carriage conditions. The more precisely the risk is described, the easier it is for the carrier to assess whether and how the instruction can be implemented.

How a necessary instruction should be formulated

A necessary instruction identifies the specific protective step. It should identify the consignment, describe the requested process and explain which risk the step is intended to prevent or limit. The carrier also needs an accessible contact person and a way to clarify questions quickly.

A clear message can contain four points: the identity of the consignment, the reason for the risk, the requested measure and the required timing. The consignee should also record whether confirmation, proof of implementation or a response to practical obstacles is requested.

Section 434 does not turn the instruction into a general authority for the consignee to rewrite the contract. The instruction must serve the protective purpose. Changes to the delivery place, the contractual service or the economic conditions may require additional consent and must be assessed separately.

How to document the risk and the instruction

In a later dispute, it is not enough that the consignee sent a message. The important points are what information reached the carrier, when it reached the carrier and how the carrier responded. Email, messaging records, telephone notes, receipt confirmations and replies should therefore form one chronology.

Preserve the original message with its date and time. Add the carriage order, consignment details and available status information. If the carrier refuses the measure or suggests another solution, preserve that response in full. A later summary of the conversation only provides limited replacement for the original communication.

The file should distinguish the alleged risk from the consequence that actually occurred. A risk may have existed even if no damage followed. Conversely, damage discovered later does not by itself prove that a specific instruction under section 434 was required or correctly implemented.

Why delivery before arrival requires separate review

Section 434 expressly separates protective measures from delivery before arrival. The consignee may demand delivery before the goods arrive at the place of delivery only if the consignor authorised the carrier to do so. The consignee’s own request is not enough.

The review must therefore locate an authorisation from the consignor. It may appear in communications, a power of attorney or the contractual documents. Record its content, scope and timing separately. Information that the consignee is expecting the goods is not automatically an authorisation for early delivery.

Delivery after arrival is a different issue. For acceptance, reservations and apparent damage, see the article on consignee acceptance and reservations at delivery.

Distinguishing consignee rights from CMR control rights

The consignee’s right under section 434 is not the same as the consignor’s right of disposition under the CMR. The two rules may sound similar, but they concern different roles and legal bases. The consignor exercises control over the consignment under the rules applicable to the carriage. The consignee acts under section 434 during the period before arrival.

A mixed analysis can give a consignee instruction a scope it does not have. First identify whether the carriage is a national carriage under the Austrian Commercial Code or an international CMR carriage. Then classify the statement as a protective measure, an instruction, a change to delivery or a request for early delivery.

The related article on consignor control rights under the CMR addresses the other role. It does not replace the review of the consignee’s rights under section 434.

Which documents matter for an initial review

For an initial assessment, individual messages are rarely enough. Assemble the carriage order, consignment number, goods description, planned delivery place and timeline. Add the information said to show the specific risk.

Then arrange each instruction with its time, recipient and response. Mark whether the carrier confirmed, rejected, changed or apparently ignored the measure. If early delivery was requested, the consignor’s authorisation belongs in a separate part of the file.

Finally record what actually happened. Were the goods secured, rerouted, held, carried on or delivered at the planned place? These facts support the legal review and should not be replaced by a later legal conclusion.

Common errors with instructions before arrival

Confusing early delivery and protection: An instruction to secure the goods must be assessed differently from a demand for delivery before arrival at the place of delivery.

Describing the risk only in general terms: The message should identify the consignment, the specific risk and the requested measure.

Failing to preserve consignor authorisation: A request for early delivery requires a review and record of the consignor’s authorisation.

Leaving a telephone instruction unconfirmed: After a call, record the content, time, conversation partner and agreed response in writing.

Equating the Austrian Commercial Code and the CMR: The consignee right under section 434 and the consignor’s CMR control right have different legal starting points.

How to organise the case now

Start with a short factual list: where are the goods, when are they expected at the place of delivery, what risk exists and what should the carrier do? Then arrange each communication by time and receipt.

Next separate five questions: does section 434 apply, is the measure required to secure the goods, was the instruction necessary, was it implemented and is early delivery requested? The last question requires proof of the consignor’s authorisation.

If documents conflict or the instruction already affected the carriage, the complete carriage file should be reviewed as one sequence. The general article on delivery delay and carriage obstacles addresses separate questions about a disrupted carriage.

Subscribe to legal updates

Receive new articles and legal information from the firm through BRANDaktuelle legal updates.

Practical questions

Frequently asked questions on section 434

May a consignee instruct the carrier before arrival? +

Yes. Under section 434 of the Austrian Commercial Code, the consignee may issue necessary instructions serving to secure the goods. The instruction should relate to the specific consignment and specific risk.

Can the consignee demand delivery before arrival? +

The consignee may demand delivery before arrival at the place of delivery only if the consignor authorised the carrier to do so. The consignee’s own request does not replace that authorisation.

Does section 434 apply to every international CMR carriage? +

The provision is part of the Austrian Commercial Code and must be distinguished from the law applicable to the carriage. For an international road carriage, the CMR and its scope must therefore be checked first.

What should a consignee instruction contain? +

It should identify the consignment, the specific risk, the requested protective measure, the timing and an accessible contact person. Receipt and the carrier’s response should also be preserved.

Discuss a freight-law matter